CTA provided commissioning services for the mechanical and control systems at the Dell Technical Support Center in Panama City, Panama. Commissioning for the mechanical systems included: a factory inspection for construction and testing of the air handling units, verification and testing of the air handler systems after factory start-up on-site, verification of operation for terminal units and verification of test and balance of the air systems. Functional performance test were also completed on the temperature control system to ensure all systems were operating correctly, programs for energy conservation measures were operational, system graphics were developed and owner training was delivered.