This sensitive historic renovation of an early 20th century dining hall facility required stone foundation remediation in a highly expansive soil environment. The first floor system was lowered to provide increased ceiling height, structural remediation of many of the building components to meet changed occupancy loading requirements, seismic renovation, and terrorist blast hardening.